EL DORADO ENGINEERING, INC.
DESIGNERS/CONSULTANTS
2964 West 4700 South  •  Salt Lake City  •  Utah  •  84118-2554
PHONE: (801) 966-8288   •  FAX: (801) 966-8499   •  E-Mail Us


Magnesium Recovery Prototype Plant Project Files

File Name Description Date Posted
Schedule.pdf Project Schedule 3/03/04
SiteVisitTripReport - 01-11-2004.pdf Report of Site Visit by Bryan Crist 2/26/04
PROCESS FLOW & P&ID DWGS.pdf Process Flow and P&ID Documents 6/24/04
50% Design Submittal Documents
BuildingLayout.doc Building Layout 3/29/04
preparation area.doc Preparation Area 3/29/04
Shroud Wire Cutting System.doc Shroud & Wire Cutting System 3/29/04
candle handling .doc Candle Handling 3/29/04
Rotating Chuck .doc Rotating Chuck 3/29/04
spray booths .doc Spray Booths 3/29/04
WaterJetSystem.doc Waterjet Cutting System 3/29/04
Flexible Sidewall Conveyor.doc Flexible Sidewall Conveyor System 3/29/04
CrushingNip.pdf Crushing Nip 2/26/04
Settlingtank.pdf Settling Tank 2/18/04
TubularDragConveyor.doc Tubular Drag Conveyor 3/29/04
polishing column.doc Polishing Column Assembly 3/29/04
Delugetank.pdf Deluge Tank 2/18/04
Final rinse dewater.doc Final Rinse/Dewatering 3/29/04
Dryer-gn2 system.doc Dryer/GN2 System 3/29/04
Classifer.doc Classifier 3/29/04
Salt Water Filter.doc Salt Water Filter System 3/29/04
EvaporatorSystem.doc Evaporator Kettles 3/29/04
drum dryer.doc Drum Dryer 3/29/04
Electrical .doc Electrical Systems 3/29/04
SINGLE LINE DIAGRAM.pdf           Single Line Diagram 3/29/04
Controls .doc Control Systems 3/29/04
EQUIPMENT IDENTIFCATION.pdf           Equipment Identification 3/29/04
PROCESS FLOW & P&ID DWGS.pdf           P&ID Drawings 3/29/04
Appendix A
MgRecoveryProcessPHAfile-W97.doc Process Hazards Analysis 3/29/04
MgRecoveryLogicDiagram-97.doc Logic Diagrams 3/29/04
Appendix B
candle specifics.doc  Candle Specifics 3/29/04
Appendix C
ModularizationofEquipment.doc Updated Construction Plan 3/29/04
     
     
Preliminary Drawings
0437 REV 0 S-1.pdf 0437 REV 0 S-2.pdf 280-J-1 Layout1.pdf Drum Dryer Piping.pdf
Polishing Column Piping.pdf 31304-602-02 Layout1.pdf 60mm ADAPTER GUIDE DETAILS.pdf 81mm ADAPTER GUIDE DETAILS.pdf
Area5 Salt Water System 040712 -316-01 sh1.pdf Area5 Salt Water System 040712 -401-01 sh1.pdf Area5 Salt Water System 040712 -401-01 sh2.pdf Area5 Salt Water System 040712 -401-01 sh3.pdf
Area5 Salt Water System 040712 -602-01.pdf Area5 Salt Water System 040712 -602-02.pdf Bench Assembly Layout1 .pdf Bench Assembly Layout2.pdf
Building Layout.pdf CUTOFF VALVE SUBASSEMBLY Sheet 1.pdf CUTOFF VALVE SUBASSEMBLY Sheet 2.pdf deluge tank Layout1.pdf
DUAL HEAD LANCE SUBASSEMBLY Sheet 1.pdf DUAL HEAD LANCE SUBASSEMBLY Sheet 2.pdf DUAL HEAD LANCE SUBASSEMBLY Sheet 3.pdf Dual Head Nozzle 0 & 20 degree 1 assy Sheet 1.pdf
Dual Head Nozzle 0 & 20 degree 1 assy Sheet 2.pdf Dual Head Nozzle Assembly Sheet 1.pdf Dual Head Nozzle Assembly Sheet 2.pdf FEEDER CONNECTOR.pdf
GRIPPER SUPPORT DETAIL Sheet 1.pdf GRIPPER SUPPORT DETAIL Sheet 2.pdf GRIPPER SUPPORT DETAIL Sheet 3.pdf GRIPPER SUPPORT DETAIL Sheet 4.pdf
GRIPPER SUPPORT DETAIL Sheet 5.pdf GRIPPER SUPPORT DETAIL Sheet 6.pdf Illuminant Tray Layout1.pdf ISO DELUGE TANK.pdf
ISO DRIP PAN.pdf ISO SB CHILLER.pdf LUU-2 ADAPTER GUIDE DETAILS.pdf POLISHER.pdf
POLISHER (2).pdf POLISHER (3).pdf POLISHER (4).pdf POLISHER (5).pdf
RIGHT LEFT  ADAPTER PLATE.pdf STA 1 GUIDE DETAILS.pdf STA 2 GUIDE DETAILS.pdf STA 3 GUIDE DETAILS.pdf
STATION 1-FEEDER PLATE.pdf STATION 2-UPPER LOWER FEEDER PLATE.pdf STATION 3-UPPER MIDDLE LOWER  FEEDER PLATE.pdf  

To add content to this page, contact Colin Heald or Chad Lasson.

This page was last updated on 08/05/2004

Click here to return to the El Dorado Engineering, Inc. Home Page